Equipment Installation

- May 09, 2019-

The installation of the device is the responsibility of the user, and ACTFil is responsible for guiding the installation of the device.

After all process equipment is in place, the piping between the equipment is matched according to the site. All pipes are hard-wired (threaded or welded) and constructed by professionals to avoid leakage. It is best to use copper or stainless steel pipes for the pipeline between the finished nitrogen outlet and the gas point (the newest galvanized pipe is used) and welded.

The power supply and cooling water are led to the equipment site, and the switchboard and cooling water supply facilities are prepared.